WE Report

Lessons Learned

Lesson Learned





By: Drilling Supervisor

Report No.

2280

Discipline/Origin

Drilling
Own Experience

Well

Fat Canyon
6306/3-1 S

Date created

2021/11/07
1491 days ago

Project Phase

Operational
Project Phase

LL Type/Classification

Operational
Positive

Borgland Dolphin


What happened in Intermediate section:
Had initially many problems with Franks equipment that did not work, and cold windy weather outside for the operators that was outdoor running the equipment.

What Was Planned

Run 9 5/8″ casing with FA-1 casing circulating tool where Franks is running all handling equipment, slips, elevator, casing tong, pick up elevator.

What Was Learned

Helping each other and working together as a team will improve performance over time. Running speed increased over the day from 7 jts/hr to 13 jts/hr in a very consistent manner.

What Actions Are Required

Continue work as a team and facilitate work for each other.

What Was Done

Worked with Franks operators, facilitated their work. Gave them food, drinks, gave them a break, had toolpusher look for small improvements, optimized small parts of the operation.